Publications

Cambutal Creek – Erosion Control

Written by Jordi van Marion | Nov 22, 2024 2:03:01 PM

In partnership with Maccaferri, a global leader in engineered solutions for coastal and river control, GLC undertakes a critical erosion protection project in Cambutal, Panama. The feasibility study phase, completed in Q-1 2020, paved the way for the execution of erosion protection works along the coast, where the Cambutal river converges with the Pacific Ocean. Leveraging advanced civil water management techniques, this project aims to safeguard the coastline against erosion, ensuring the long-term environmental sustainability of the area.

  • Year Build:  Q3 2019 – Q1 2020
  • Project Name:  Cambutal Creek, Erosion Control
  • Location:  Cambutal, Panama
  • Type Construction:  Civil water management works
  • Client:  FP Industries SA
  • Scope of works: Feasibility study and execute erosion protection measures along the Cambutal coastline to mitigate coastal erosion risks and ensure sustainability.